TCEP 193: Using Alternate Delivery Methods to Deliver Civil Engineering Projects

Media Thumbnail
00:00
00:00
1x
  • 0.5
  • 1
  • 1.25
  • 1.5
  • 1.75
  • 2
This is a podcast episode titled, TCEP 193: Using Alternate Delivery Methods to Deliver Civil Engineering Projects. The summary for this episode is: <p>In this episode, I talk to Steve Long, P.E., a senior engineer with Freese and Nichols, Inc., who currently serves as the Program Manager for the North Texas Municipal Water District&#8217;s Bois d&#8217;Arc Lake Program. He discusses alternate delivery methods for the Bois d&#8217;Arc Lake Program and how one of these methods helped his client [&#8230;]</p> <p>The post <a href="https://engineeringmanagementinstitute.org/tcep-193-alternate-delivery-methods-deliver-civil-engineering-projects/">TCEP 193: Using Alternate Delivery Methods to Deliver Civil Engineering Projects</a> appeared first on <a href="https://engineeringmanagementinstitute.org">Engineering Management Institute</a>.</p>

DESCRIPTION

In this episode, I talk to Steve Long, P.E., a senior engineer with Freese and Nichols, Inc., who currently serves as the Program Manager for the North Texas Municipal Water District’s Bois d’Arc Lake Program. He discusses alternate delivery methods for the Bois d’Arc Lake Program and how one of these methods helped his client […]

The post TCEP 193: Using Alternate Delivery Methods to Deliver Civil Engineering Projects appeared first on Engineering Management Institute.